120-tray/min pick-and-place
Meal Kit Assembly operators faced inconsistent results, manual logs, and downtime that hit revenue at peak.
Deployed SERIES_X with telemetry-bound recipes, predictive twin, and 4-hour SLA. Commissioned in phased night windows with zero production loss.
Labor cost down 47%




