The Foundry · Houston, TX · 420,000 sq ft

420,000 square feetof American precision.

The Atlas foundry is a vertically integrated industrial campus — raw stainless in, finished telemetry-grade equipment out. Built like a Tier 1 aerospace supplier.

Capabilities

Process stack

5-Axis CNC

Eight Mazak Integrex cells running 24/7 with sub-micron tolerance.

Laser Fabrication

8kW fiber lasers cutting 1/4-inch stainless at production scale.

Robotic Welding

FANUC argon-shielded TIG cells with vision-system QC at every joint.

R&D Laboratory

Thermal, acoustic, and combustion test rigs for prototype validation.

Surface Finishing

Electropolishing, passivation, and titanium-nitride deposition.

Energy Recovery

62% process heat recovery and on-site solar augmentation.

Industrial_Timeline

Atlas, year by year.

  1. 2019

    Atlas founded in Columbus, OH.

  2. 2021

    First robotic welding cell commissioned.

  3. 2023

    Foundry expanded to 420,000 sq ft.

  4. 2025

    Native IoT telemetry standardized across every chassis.

  5. 2026

    Global launch — 84 markets, seven distribution hubs.

WORKFORCE

1,240 American craftspeople

SUSTAINABILITY

62% process heat recovery

QC

100% chassis inspection — laser metrology

Schedule_a_Visit

See the foundry floor.

Operators, dealers, and press are welcome on-site. Tours run Tuesday–Thursday with engineering staff available for technical Q&A.